What is the importance of shop drawings for manufacturers?

Shop drawings or fabrication drawings are highly important part of construction projects, as they contain significant amount of authentic details about such building components which are manufactured by manufacturing firms. When it comes to the significance of these drawings for manufacturers it is all about their accuracy, as they are required to refer them for acquiring explicit details about fabrication. Shop drawings are basically developed for MEP and structural components, which require fabrication. When it comes to the development of shop drawings detailers have important role and responsibilities, since they are the one who are hired by general contractors for the production of these highly complex and detailed drawings.



In context of structural design and construction, Structural Steel Detailing Services are hired by general contractors wherein comprehensive structural drawings (shop drawings and erection drawing) are developed by detailers. Structural shop drawings generated during structural detailing include in them highly detailed data about structural components such as joists, columns, beams, trusses and rebar etc. Similarly detailing is also performed for MEP (mechanical, electrical and plumbing) components and high quality MEP shop drawings are generated. In MEP shop drawings comprehensive information is provided about the components of HVAC, electrical and plumbing systems such as HVAC ducts and plumbing pipes etc.

Since high level of accuracy in fabrication drawings is excessively important for fabricators, shop drawings are effectively scrutinized and reviewed by structural engineers and MEP engineers after they are effectively completed by detailers. In other words, prior to the release of MEP and structural shop drawings to manufacturers they are reviewed in details by respective engineers. Every aspect of fabrication drawings is attentively analyzed and reviewed by engineers and identified errors are sent for corrections to detailers. That means if errors are found in large numbers by engineers then these drawings are provided to detailers for corrections. Until and unless all the identified mistakes are effectively rectified by detailers shop drawings cannot be approved by architects and engineers. That means after all the design errors in the shop drawings are successfully resolved and when they get approval from architects and engineers they can be provided to fabricators.


In this way fabricators get correct fabrication details through shop drawings. 

Comments

Popular posts from this blog

A brief account on BIM’s expansion over the years

Building Information Modeling has a dramatic history when it comes to its expansion in the landscapes of AEC industry over the years. BIM which is also known as Virtual Design and Construction has a dominant presence in AEC industry because of the fact that is has the potential to realize project outcomes and can control them significantly as per requirement. In short design and construction professionals can attain superior control over project outcomes by analyzing multidiscipline models. Well, Building Information Modeling evolved as a concept some four decades ago but it was not practiced by AEC professionals in the industry at that time. For approximately ten years since it first appeared in the journal, the term ‘BIM’ used to be seen only in research papers. BIM as a technology and a process started to be implemented in construction projects some thirty years ago. So once AEC professionals started using BIM in construction they never looked back to their sluggish performanc

Structural Design Procedure: Step Wise Description

Construction of the building requires humongous time as it includes development of multiple disciplines like architecture, structure, MEP and ultimately bringing them all together. Amid all these discipline structural design is one of the most subtle disciplines as it strengthens the building and makes it stand still. It doesn’t mean that other disciplines are not important; however structural design is more convoluted. Before structure gets developed, initially lots of analyses are conducted in order to ensure sustenance of the building. The procedure starts with several analyses like site analysis, soil analysis load calculation etc. Site analysis is conducted to have an idea about feasibility of construction while soil analysis is done to identify the quality of soil and whether it is able to endure the load of the building. In load calculation it is being calculated that how much load a structure can bear. Having received green signal from all those analyses design

MEP systems provide the momentum to the building

Mechanical, electrical and plumbing systems are incredibly crucial for any sort of building, be it residential, commercial or industrial.   The design for these systems is prepared by MEP modelers who have vast experience in the execution of BIM modeling services.  They develop design for MEP systems in Revit MEP software which is quintessentially dedicated to the design development of MEP systems only. MEP systems consist of HVAC systems, electrical systems and plumbing systems. Detailed explanation of these systems is following  HVAC Systems These systems comprise of heating, ventilation, air conditioning systems. HVAC systems have to be accurate since they are responsible for the circulation of various resources. The design of these systems must be created in a way that they reach to every part of the building where they supposed to reach. They are utilized in all kinds of building projects as well as non building projects such as industrial and c