Skip to main content

What kinds of drawings form a part of construction drawings?

‘Construction drawings’ is an umbrella word for all kinds of engineering and architectural drawings which are used by AEC professionals for constructing a building. All these constriction drawings are generated by architects and engineers but when it comes to their drafting technicians of service providing company are responsible for it. In other words construction drawings are developed by the CAD drafters of service providing company with the assistance of architect, structural engineer, mechanical engineer, electrical engineer and plumbing engineer.

In other words constriction drawings include all kinds of architectural, structural and MEP drawings that are generated during the drafting phase of the project. These drawings are highly mandatory for architects and engineers for referring important details regarding multidiscipline building systems. All kinds of shop drawings such as architectural shop drawings, structural shop drawings and MEP shop drawings are generated by the AEC professionals so that detailed information can be gathered regarding the elements of multidiscipline building systems.

Architectural drawings such as site plans, floor plans, sections, elevations etc are optimized by architect and architectural BIM modelers. However structural drawings such as structural shop drawings and erection drawings are required for the construction of structural framework of the building. Similarly MEP drawings which include mechanical drawings, electrical drawings and plumbing drawings are crucial for the development of MEP systems of the building.

It is highly important that all these drawings are generated with extreme precision because when it comes to on site construction instead of models construction drawings are utilized by architects and engineers. And that is the reason these drawings are always generated with the assistance of a service providing company which generates them with utmost precisions after optimizing architect’s and engineer’s specifications.

So be it architectural, structural and MEP drawings when they are developed by the technicians of the service providing company specifications provided by architect and engineers are considered very seriously.


So with the assistance of accurate construction drawings effective buildings are constructed by architects and engineers on the proposed construction location. 

Comments

Popular posts from this blog

A brief account on BIM’s expansion over the years

Building Information Modeling has a dramatic history when it comes to its expansion in the landscapes of AEC industry over the years. BIM which is also known as Virtual Design and Construction has a dominant presence in AEC industry because of the fact that is has the potential to realize project outcomes and can control them significantly as per requirement. In short design and construction professionals can attain superior control over project outcomes by analyzing multidiscipline models. Well, Building Information Modeling evolved as a concept some four decades ago but it was not practiced by AEC professionals in the industry at that time. For approximately ten years since it first appeared in the journal, the term ‘BIM’ used to be seen only in research papers. BIM as a technology and a process started to be implemented in construction projects some thirty years ago. So once AEC professionals started using BIM in construction they never looked back to their sluggish performanc

Structural Design Procedure: Step Wise Description

Construction of the building requires humongous time as it includes development of multiple disciplines like architecture, structure, MEP and ultimately bringing them all together. Amid all these discipline structural design is one of the most subtle disciplines as it strengthens the building and makes it stand still. It doesn’t mean that other disciplines are not important; however structural design is more convoluted. Before structure gets developed, initially lots of analyses are conducted in order to ensure sustenance of the building. The procedure starts with several analyses like site analysis, soil analysis load calculation etc. Site analysis is conducted to have an idea about feasibility of construction while soil analysis is done to identify the quality of soil and whether it is able to endure the load of the building. In load calculation it is being calculated that how much load a structure can bear. Having received green signal from all those analyses design

MEP systems provide the momentum to the building

Mechanical, electrical and plumbing systems are incredibly crucial for any sort of building, be it residential, commercial or industrial.   The design for these systems is prepared by MEP modelers who have vast experience in the execution of BIM modeling services.  They develop design for MEP systems in Revit MEP software which is quintessentially dedicated to the design development of MEP systems only. MEP systems consist of HVAC systems, electrical systems and plumbing systems. Detailed explanation of these systems is following  HVAC Systems These systems comprise of heating, ventilation, air conditioning systems. HVAC systems have to be accurate since they are responsible for the circulation of various resources. The design of these systems must be created in a way that they reach to every part of the building where they supposed to reach. They are utilized in all kinds of building projects as well as non building projects such as industrial and c