Skip to main content

What is the most accurate procedure for the creation of fabrication drawings?

Manufacturing of building components is the only important task which is performed by fabricators in context of building construction and for accomplishing that they require detailed sketches, plans and drawings which can clearly describe fabrication details. For developing these plans, comprehensive sketches and drawings steel detailers are necessary as they only know the technicalities of creating fabrication related information. But detailers alone can also not develop these drawings as it’s mandatory for them to take the help from architects and engineers who are accountable for creating the design for those building components which are required to be manufactured. Hence as far as specifications developed by chief architect of the building are not accessed by steel detailers they can surely not develop fabrication drawings.



Information achieved from structural engineers and architects provide accurate data related to the length, breadth, shape and size etc of structural components which should be manufactured by fabricators. Once accurate information about structural components is achieved by steel detailers from architects and structural engineers they can start developing detailed sketches, single part drawings and other important structural drawings which can be provided to fabricators.

Detailing standards created by following organizations are used by detailers

·         American Institute of Steel Construction (AISC)
·         Japanese Society of Steel Construction
·         British Constructional Steelwork Association (BCSA)
·         The Southern African Institute of Steel Construction
·         Korean Iron & Steel Association
·         Taiwan Steel and Iron Industry Association (TSIIA)
·         Canadian Institute of steel construction
·         The European Confederation of Iron and Steel Industries
·         Swedish Institute of steel construction (SBI)
·         Brazilian Steel Institute (IBS) etc

The detailing standards in the Structural Steel Detailing Services established by different organizations should be properly known to steel detailers belonging to outsourcing companies since they have to create fabrication drawings for clients across the world.


Once fabrication drawings are generated by steel detailers with the reference of necessary detailing standards they should ask structural engineers to verify the drawings. Once the drawings are properly verified they can be easily approved by them. 

Comments

Popular posts from this blog

A brief account on BIM’s expansion over the years

Building Information Modeling has a dramatic history when it comes to its expansion in the landscapes of AEC industry over the years. BIM which is also known as Virtual Design and Construction has a dominant presence in AEC industry because of the fact that is has the potential to realize project outcomes and can control them significantly as per requirement. In short design and construction professionals can attain superior control over project outcomes by analyzing multidiscipline models. Well, Building Information Modeling evolved as a concept some four decades ago but it was not practiced by AEC professionals in the industry at that time. For approximately ten years since it first appeared in the journal, the term ‘BIM’ used to be seen only in research papers. BIM as a technology and a process started to be implemented in construction projects some thirty years ago. So once AEC professionals started using BIM in construction they never looked back to their sluggish performanc

Structural Design Procedure: Step Wise Description

Construction of the building requires humongous time as it includes development of multiple disciplines like architecture, structure, MEP and ultimately bringing them all together. Amid all these discipline structural design is one of the most subtle disciplines as it strengthens the building and makes it stand still. It doesn’t mean that other disciplines are not important; however structural design is more convoluted. Before structure gets developed, initially lots of analyses are conducted in order to ensure sustenance of the building. The procedure starts with several analyses like site analysis, soil analysis load calculation etc. Site analysis is conducted to have an idea about feasibility of construction while soil analysis is done to identify the quality of soil and whether it is able to endure the load of the building. In load calculation it is being calculated that how much load a structure can bear. Having received green signal from all those analyses design

MEP systems provide the momentum to the building

Mechanical, electrical and plumbing systems are incredibly crucial for any sort of building, be it residential, commercial or industrial.   The design for these systems is prepared by MEP modelers who have vast experience in the execution of BIM modeling services.  They develop design for MEP systems in Revit MEP software which is quintessentially dedicated to the design development of MEP systems only. MEP systems consist of HVAC systems, electrical systems and plumbing systems. Detailed explanation of these systems is following  HVAC Systems These systems comprise of heating, ventilation, air conditioning systems. HVAC systems have to be accurate since they are responsible for the circulation of various resources. The design of these systems must be created in a way that they reach to every part of the building where they supposed to reach. They are utilized in all kinds of building projects as well as non building projects such as industrial and c